Summary

Row

Current Period

FAT off-site;
Completed hydrostatic test of sump;
Spring tree planting;
Waste shipment;
Belt skimmer installation.

Row

Upcoming period

Sump floats repair;
Quarterly inspection;
Final discipline reviews;

Row

Compliance Task

Task …2 …3 …4 …5 …6 …7 …8 …9 Status …11 …12 …13 Date Due
Effluent Sampling NA NA NA NA NA NA NA NA Complete NA NA NA 2019-07-01
Annual Sewer Use Bylaw NA NA NA NA NA NA NA NA Complete NA NA NA 2019-06-15
By-pass reporting NA NA NA NA NA NA NA NA Complete NA NA NA 2019-06-15
NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA

H&S

Row

Most Recent Observations

Date Type Description Contractor Stakeholder…12
2018-12-29 O That it may run not unless virtue guide it NA NA
2018-12-25 O So that if some good star, or better thing, NA NA
2018-12-22 O Have given me good, I may myself not grudge it. NA NA
2018-12-22 O For who repents not cannot be absolved, NA NA
2018-12-18 O Nor can one both repent and will at once, NA NA
2018-12-14 O Because of the contradiction which consents not.’ NA NA
2018-12-14 O Who ever could, e’en with untrammelled words, NA NA
2018-12-14 O Tell of the blood and of the wounds in full NA NA
2018-12-09 O Which now I saw, by many times narrating? NA NA
2018-12-04 O NA NA NA
2018-12-04 O NA NA NA
2018-11-30 O NA NA NA
2018-11-27 O NA NA NA
2018-11-24 O NA NA NA
2018-11-24 O NA NA NA
2018-11-24 O NA NA NA
2018-11-24 O NA NA NA
2018-11-19 O NA NA NA
2018-11-10 O NA NA NA
2018-11-09 O NA NA NA
2018-11-03 O NA NA NA
2018-11-02 O NA NA NA
2018-10-27 O NA NA NA
2018-10-23 O NA NA NA
2018-10-15 O NA NA NA
2018-10-13 O NA NA NA
2018-10-09 O NA NA NA
2018-10-08 O NA NA NA
2018-10-05 O NA NA NA
2018-10-05 O NA NA NA

Row

Influent

Row

Source Flow Trend (m3), prior month

Row

Operating Parameters, prior month

Discharge

Row

Plant Flow

WTF Op.

Row

Waste Inventory

Chemical Consumption

Maint. Log

Row

Maintenanace Events, Past Month

Date Type…6 Location Notes Sub. / Company
2021-12-05 Other - See notes Source(Various) Pump head cleaning and assembly NA
2021-12-06 Other - See notes Waste Disposal waste shipment NA
2021-12-06 Comp-Weekly WTF-S23 Collected and submitted weekly composite effluent sample for analysis NA
2021-12-06 Monthly Media/GAC Vessels Collected and submitted monthly media vessel breakthrough NA
2021-12-07 Other - See notes Source(Various) Pump head cleaning and assembly NA
2021-12-09 Annual Forklift Annual forklift service NA
2021-12-12 Shipment Storage Building - General Media shipment NA
2021-12-12 Other - See notes Other - See notes Plowed snow. NA
2021-12-13 Comp-Weekly WTF-S23 Collected and submitted weekly composite effluent sample for analysis NA
2021-12-13 Other - See notes Source(Various) Monitored LNAPL and water levels in all PWs NA
2021-12-16 Plumbing WTF - General Installed air bleed valves on sump pit pumps NA
2021-12-16 Other - See notes WTF - General Prepared for upcoming media change out NA
2021-12-20 Annual Air Compressor Annual air compressor inspection NA
2021-12-20 Sub - see notes Storage Building - General Fire truck responded to false fire alarm caused by dust NA
2021-12-20 Comp-Weekly WTF-S23 Collected and submitted weekly composite effluent sample for analysis NA
2021-12-23 Other - See notes Process Tank Skimmed the surface of the process tank NA
2021-12-23 Other - See notes Sump Pit Skimmed the surface of the sump pit NA
2021-12-23 Mechanical Storage Building - General Replaced faulty smoke detector NA
2021-12-27 Comp-Weekly WTF-S23 Collected and submitted weekly composite effluent sample for analysis NA
2021-12-30 Monthly General Completed monthly inspection of fire extinguishers and eye wash stations NA
2021-12-30 Monthly Storage Building - Area Completed monthly Area Inspection NA

Chemistry

SCADA

Row

Source file, data logged every second in dbf